Datamine Task Scheduler (DTS) 2025 v4.0

Latest update

February 27, 2026

License Price

325 $

OS

Windows

Datamine Task Scheduler

 

Datamine Task Scheduler (DTS) is a powerful Gantt chart scheduler specifically engineered for the unique challenges of underground and open pit mining operations. Unlike generic project management tools, DTS is purpose-built for mining environments—handling both production tasks (extraction, processing) and non-production activities (maintenance, workplace preparation, shift changes) within a single, integrated scheduling environment. Version 2025 v4.0.366 continues Datamine’s legacy of providing mine planners with intuitive yet powerful scheduling tools, seamlessly integrated with the broader Studio mine design software ecosystem. Whether planning short-term operations for the coming shift or developing long-term strategies spanning years, DTS enables mine planners to create realistic, achievable schedules that optimize resource utilization and minimize conflicts.

 

⛏️ Primary Users

This specialized mine scheduling software is designed for:

  • Mine Planners & Mining Engineers creating detailed schedules for underground and open pit operations.

  • Production Supervisors & Operations Managers coordinating daily mining activities and resource allocation.

  • Short-Term & Long-Term Planners developing schedules ranging from shift-level to multi-year mine plans.

  • Mine Operations Teams integrating production and non-production tasks into cohesive schedules.

  • Mine Management & Executives visualizing project timelines and resource utilization for strategic decision-making.

 

⚡ Key Features & Capabilities

📅 Mining-Specific Gantt Scheduling

Production Task Scheduling:

  • Schedule extraction activities for underground and open pit operations

  • Define task durations, dependencies, and resource requirements

  • Visualize production sequences over time

  • Track progress against planned schedules

Non-Production Task Integration:

  • Maintenance activities and equipment servicing

  • Workplace preparation and development tasks

  • Shift changes and crew rotations

  • Geotechnical monitoring and safety activities

Task Dependencies:

  • Define complex relationships between tasks

  • Predecessor and successor relationships

  • Lag and lead time management

  • Critical path identification

🔧 Interactive Scheduling Tools

Drag-and-Drop Interface:

  • Intuitive Gantt chart manipulation

  • Reschedule tasks by dragging on timeline

  • Real-time dependency updates

  • Visual feedback on scheduling changes

Conflict Detection:

  • Automatic identification of scheduling conflicts

  • Resource overallocation warnings

  • Dependency violation alerts

  • Visual highlighting of problem areas

Conflict Resolution:

  • Advanced leveling algorithms for automatic conflict resolution

  • Manual override options for planner control

  • What-if scenario testing

  • Optimized resource allocation

⚙️ Rule-Based Scheduling

Customizable Scheduling Rules:

  • Define project-specific scheduling logic

  • Sequencing rules based on mining method

  • Equipment and resource availability constraints

  • Geotechnical and safety requirements

Automated Schedule Generation:

  • Generate schedules based on defined rules

  • Consistent application of planning logic

  • Rapid scenario creation

  • Reduced manual scheduling effort

🏭 Open Pit Scheduling

Pit Development Sequencing:

  • Bench-by-bench extraction scheduling

  • Haulage and material movement planning

  • Waste dump and stockpile management

  • Pushback design integration

Equipment Allocation:

  • Shovel, truck, and dozer assignment

  • Fleet optimization

  • Equipment utilization tracking

  • Maintenance schedule integration

⛑️ Underground Scheduling

Development Sequencing:

  • Decline and level development scheduling

  • Stope extraction sequencing

  • Backfill and support activities

  • Ventilation and infrastructure coordination

Production Planning:

  • Stope-by-stope extraction timing

  • Haulage and hoisting schedules

  • Ore and waste handling

  • Workforce allocation

📊 Reporting & Visualization

Rich Mine Planning Reports:

  • Gantt charts with mining-specific formatting

  • Resource utilization summaries

  • Production forecasts and targets

  • Progress tracking against plan

Customizable Outputs:

  • User-defined report formats

  • Export to PDF, Excel, and other formats

  • Visual dashboards for operations

  • Management summary reports

Integration with Studio:

  • Seamless connection with Datamine Studio design software

  • Dynamic updates between design and schedule

  • Visualize scheduling impacts on mine design

  • Interactive what-if analysis

🔄 Dynamic Schedule Updates

Real-Time Adjustments:

  • Modify schedules based on actual progress

  • Update task durations and dependencies

  • Reallocate resources dynamically

  • Maintain realistic forward plans

Scenario Comparison:

  • Compare multiple scheduling scenarios

  • Evaluate alternatives before committing

  • Sensitivity analysis

  • Risk assessment and contingency planning

📈 Resource Management

Resource Definition:

  • Equipment, crews, and material resources

  • Resource calendars and availability

  • Capacity constraints

  • Shared resource management

Resource Leveling:

  • Automatic smoothing of resource demand

  • Identify and resolve peaks

  • Optimize workforce and equipment utilization

  • Balance multiple projects and areas

🆕 What’s New in Version 2025 v4.0.366

  • Enhanced Leveling Algorithms – Improved automatic conflict resolution with faster performance

  • Studio Integration Updates – Tighter coupling with Datamine Studio design environment

  • Rule-Based Scheduling Enhancements – More sophisticated scheduling logic options

  • Reporting Improvements – New report templates with enhanced visualization

  • Resource Management Updates – Better tracking and allocation of shared resources

  • UI/UX Refinements – Streamlined interface with improved workflow

  • Export Options – Additional format support for reports and schedules

  • Stability Improvements – Bug fixes and reliability enhancements

Software

Price: 325 $

Price Currency: $

Operating System: Windows

Application Category: Mining Engineering

Editor's Rating:
5

Latest update

February 27, 2026

License Price

325 $

OS

Windows

Reviews

There are no reviews yet.

Be the first to review “Datamine Task Scheduler (DTS) 2025 v4.0”

Your email address will not be published. Required fields are marked *

Recommended for You